Follow
Hyounseok Moon
Hyounseok Moon
BIM Research Cluster, Korea Institute of Civil Engineering and Building Technology
Verified email at kict.re.kr
Title
Cited by
Cited by
Year
Development of workspace conflict visualization system using 4D object of work schedule
HS Moon, N Dawood, LS Kang
Advanced Engineering Informatics 28 (1), 50-65, 2014
1732014
Development of a schedule-workspace interference management system simultaneously considering the overlap level of parallel schedules and workspaces
HS Moon, HS Kim, CH Kim, LS Kang
Automation in Construction 39, 93-105, 2014
1162014
BIM-based construction scheduling method using optimization theory for reducing activity overlaps
H Moon, H Kim, VR Kamat, L Kang
Journal of Computing in Civil Engineering 29 (3), 04014048, 2015
922015
Development of a 4D object-based system for visualizing the risk information of construction projects
LS Kang, SK Kim, HS Moon, HS Kim
Automation in Construction 31, 186-203, 2013
622013
Highway alignment construction comparison using object-oriented 3D visualization modeling
H Kim, K Orr, Z Shen, H Moon, K Ju, W Choi
Journal of Construction Engineering and Management 140 (10), 05014008, 2014
562014
Development of methodology and virtual system for optimised simulation of road design data
LS Kang, HS Moon, N Dawood, MS Kang
Automation in Construction 19 (8), 1000-1015, 2010
542010
Case study of solar photovoltaic power-plant site selection for infrastructure planning using a BIM-GIS-based approach
J Heo, H Moon, S Chang, SU Han, DE Lee
Applied Sciences 11 (18), 8785, 2021
372021
Integration of BIM and GIS: Highway cut and fill earthwork balancing
H Kim, Z Chen, CS Cho, H Moon, K Ju, W Choi
Computing in civil engineering 2015, 468-474, 2015
362015
Managing construction schedule by telepresence: Integration of site video feed with an active nD CAD simulation
LS Kang, HS Kim, HS Moon, SK Kim
Automation in Construction 68, 32-43, 2016
292016
Development of BIM Library for Civil Structures based on Standardized Drawings-Focused on 2D Standard Drawings of The MOLIT
HS Moon, KB Ju
Korean Journal of Computational Design and Engineering 19 (1), 80-90, 2014
282014
Improved link system between schedule data and 3D object in 4D CAD system by using WBS code
LS Kang, HS Moon, SY Park, CH Kim, TS Lee
KSCE Journal of Civil Engineering 14, 803-814, 2010
282010
Developing a 3D intelligent object model for the application of construction planning/simulation in a highway project
H Kim, Z Shen, H Moon, K Ju, W Choi
KSCE Journal of Civil Engineering 20, 538-548, 2016
272016
BIM functions for optimized construction management in civil engineering
HS Moon, HS Kim, LS Kang, CH Kim
ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2012
262012
Data management framework of drone-based 3D model reconstruction of disaster site
C Kim, H Moon, W Lee
The International Archives of the Photogrammetry, Remote Sensing and Spatial …, 2016
182016
BIM-based maintenance data processing mechanism through COBie standard development for port facility
S Shin, H Moon, J Shin
Applied Sciences 12 (3), 1304, 2022
172022
Configuration Method of Health & Safety Rule for Improving Productivity in Construction Space by Multi-Dimension CAD System
HS Moon, LS Kang, N Dawood, J Sang-Bok
International conference on construction engineering and project management …, 2009
172009
A uav based 3-d positioning framework for detecting locations of buried persons in collapsed disaster area
H Moon, C Kim, W Lee
The International Archives of the Photogrammetry, Remote Sensing and Spatial …, 2016
162016
Development of improved 4D CAD system for horizontal works in civil engineering projects
L Kang, J Pyeon, H Moon, C Kim, M Kang
Journal of computing in civil engineering 27 (3), 212-230, 2013
152013
Development of 5D CAD system for visualizing risk degree and progress schedule for construction project
LS Kang, HS Moon, HS Kim, GY Choi, CH Kim
Computing in Civil Engineering (2011), 690-697, 2011
152011
4D system for visualizing schedule progress of horizontal construction project including earthwork
S Leen
CONVR 2006, 2006
152006
The system can't perform the operation now. Try again later.
Articles 1–20