Follow
Erlon Finardi
Erlon Finardi
Universidade Federal de Santa Catarina, LabPlan
Verified email at ufsc.br
Title
Cited by
Cited by
Year
Solving the hydro unit commitment problem via dual decomposition and sequential quadratic programming
EC Finardi, EL da Silva
IEEE transactions on Power Systems 21 (2), 835-844, 2006
2142006
Sampling strategies and stopping criteria for stochastic dual dynamic programming: a case study in long-term hydrothermal scheduling
T Homem-de-Mello, VL De Matos, EC Finardi
Energy Systems 2 (1), 1-31, 2011
1692011
On solving multistage stochastic programs with coherent risk measures
A Philpott, V de Matos, E Finardi
Operations Research 61 (4), 957-970, 2013
1642013
A mixed integer linear programming model for the energy management problem of microgrids
D Tenfen, EC Finardi
Electric Power Systems Research 122, 19-28, 2015
1492015
Solving the unit commitment problem of hydropower plants via Lagrangian relaxation and sequential quadratic programming
EC Finardi, EL Silva, C Sagastizàbal
Computational & applied mathematics 24, 317-342, 2005
1382005
Improving the performance of stochastic dual dynamic programming
VL De Matos, AB Philpott, EC Finardi
Journal of Computational and Applied Mathematics 290, 196-208, 2015
1212015
Unit commitment of single hydroelectric plant
EC Finardi, EL Da Silva
Electric Power Systems Research 75 (2-3), 116-123, 2005
1132005
Hydro unit commitment and loading problem for day-ahead operation planning problem
EC Finardi, MR Scuzziato
International Journal of Electrical Power & Energy Systems 44 (1), 7-16, 2013
1082013
A computational study of a stochastic optimization model for long term hydrothermal scheduling
VL de Matos, EC Finardi
International Journal of Electrical Power & Energy Systems 43 (1), 1443-1452, 2012
832012
Parallel processing applied to the planning of hydrothermal systems
EL da Silva, EC Finardi
IEEE Transactions on Parallel and Distributed Systems 14 (8), 721-729, 2003
622003
Practical aspects in solving the medium-term operation planning problem of hydrothermal power systems by using the progressive hedging method
MLL dos Santos, EL da Silva, EC Finardi, REC Gonçalves
International Journal of Electrical Power & Energy Systems 31 (9), 546-552, 2009
592009
Performance evaluation and energy production optimization in the real-time operation of hydropower plants
MM Cordova, EC Finardi, FAC Ribas, VL De Matos, MR Scuzziato
Electric Power Systems Research 116, 201-207, 2014
572014
Assessing solution quality and computational performance in the hydro unit commitment problem considering different mathematical programming approaches
EC Finardi, FYK Takigawa, BH Brito
Electric Power Systems Research 136, 212-222, 2016
552016
Analysis of training techniques of ANN for classification of insulators in electrical power systems
S Frizzo Stefenon, N Waldrigues Branco, A Nied, D Wildgrube Bertol, ...
IET Generation, Transmission & Distribution 14 (8), 1591-1597, 2020
492020
Applying different decomposition schemes using the progressive hedging algorithm to the operation planning problem of a hydrothermal system
REC Gonçalves, EC Finardi, EL da Silva
Electric power systems research 83 (1), 19-27, 2012
492012
Mixed-integer nonseparable piecewise linear models for the hydropower production function in the unit commitment problem
BH Brito, EC Finardi, FYK Takigawa
Electric Power Systems Research 182, 106234, 2020
452020
Lithium‐ion battery modelling for the energy management problem of microgrids
D Tenfen, EC Finardi, B Delinchant, F Wurtz
IET Generation, Transmission & Distribution 10 (3), 576-584, 2016
432016
Application of scenario tree reduction via quadratic process to medium-term hydrothermal scheduling problem
F Beltran, W De Oliveira, EC Finardi
IEEE Transactions on Power Systems 32 (6), 4351-4361, 2017
412017
Solving the hydrothermal scheduling problem considering network constraints
FYK Takigawa, EL da Silva, EC Finardi, RN Rodrigues
Electric Power Systems Research 88, 89-97, 2012
412012
A comparative analysis of different dual problems in the Lagrangian relaxation context for solving the hydro unit commitment problem
EC Finardi, MR Scuzziato
Electric Power Systems Research 107, 221-229, 2014
402014
The system can't perform the operation now. Try again later.
Articles 1–20