Vinícius Amaral Armentano
Vinícius Amaral Armentano
Professor da Faculdade de Engenharia Elétrica e de Computação da Universidade Estadual de Campinas
Verified email at densis.fee.unicamp.br
Title
Cited by
Cited by
Year
Pesquisa operacional
M Arenales, V Armentano
Elsevier Brasil, 2006
5932006
Genetic local search for multi-objective flowshop scheduling problems
JEC Arroyo, VA Armentano
European Journal of operational research 167 (3), 717-738, 2005
2162005
Tabu search for total tardiness minimization in flowshop scheduling problems
VA Armentano, DP Ronconi
Computers & operations research 26 (3), 219-235, 1999
1731999
Tabu search with path relinking for an integrated production–distribution problem
VA Armentano, AL Shiguemoto, A Løkketangen
Computers & Operations Research 38 (8), 1199-1209, 2011
1702011
Evaluation of tropical water sources and mollusks in southern Brazil using microbiological, biochemical, and chemical parameters
DSM Souza, APD Ramos, FF Nunes, V Moresco, S Taniguchi, DAG Leal, ...
Ecotoxicology and environmental safety 76, 153-161, 2012
149*2012
Tardiness minimization in a flexible job shop: A tabu search approach
CR Scrich, VA Armentano, M Laguna
Journal of Intelligent Manufacturing 15 (1), 103-115, 2004
1432004
Scatter search for project scheduling with resource availability cost
DS Yamashita, VA Armentano, M Laguna
European Journal of Operational Research 169 (2), 623-637, 2006
1252006
A Lagrangian-based heuristic for the capacitated lot-sizing problem in parallel machines
FMB Toledo, VA Armentano
European Journal of Operational Research 175 (2), 1070-1083, 2006
1162006
Tabu search for minimizing total tardiness in a job shop
VA Armentano, CR Scrich
International journal of production economics 63 (2), 131-140, 2000
1152000
The Pencil and Controllability–Observability for Generalized Linear Systems: a Geometric Approach
VA Armentano
SIAM journal on control and optimization 24 (4), 616-638, 1986
1041986
Adaptive granular local search heuristic for a dynamic vehicle routing problem
RM Branchini, VA Armentano, A Løkketangen
Computers & Operations Research 36 (11), 2955-2968, 2009
1012009
Lower bounding schemes for flowshops with blocking in-process
DP Ronconi, VA Armentano
Journal of the Operational Research Society 52 (11), 1289-1297, 2001
1002001
Robust optimization models for project scheduling with resource availability cost
DS Yamashita, VA Armentano, M Laguna
Journal of Scheduling 10 (1), 67-76, 2007
952007
A heuristic for single machine scheduling with early and tardy costs
R Mazzini, VA Armentano
European Journal of Operational Research 128 (1), 129-146, 2001
922001
Eigenvalue placement for generalized linear systems
VA Armentano
Systems & control letters 4 (4), 199-202, 1984
911984
An application of a multi-objective tabu search algorithm to a bicriteria flowshop problem
VA Armentano, JE Claudio
Journal of Heuristics 10 (5), 463-481, 2004
842004
A heuristic method for lot-sizing in multi-stage systems
PM França, VA Armentano, RE Berretta, AR Clark
Computers & operations research 24 (9), 861-874, 1997
831997
Tabu search for scheduling on identical parallel machines to minimize mean tardiness
DS Yamashita
Journal of intelligent manufacturing 11 (5), 453-460, 2000
762000
A genetic algorithm for scheduling on a single machine with set-up times and due dates
VA Armentano, R Mazzini
Production Planning & Control 11 (7), 713-720, 2000
732000
A heuristic for a resource-capacitated multi-stage lot-sizing problem with lead times
AR Clark, VA Armentano
Journal of the Operational research Society, 1208-1222, 1995
671995
The system can't perform the operation now. Try again later.
Articles 1–20