Follow
Krishna Krishnan
Krishna Krishnan
Professor on Industrial & Manufacturing Engineering, Wichita State University
Verified email at wichita.edu
Title
Cited by
Cited by
Year
Industry 4.0 in Logistics and Supply Chain Management: A Systematic Literature Review
KK Abdirad, M., Krishnan
Engineering Management Journal 33 (3), 2021
1952021
Effect of variations in the riveting process on the quality of riveted joints
SH Cheraghi
The International journal of advanced manufacturing technology 39, 1144-1155, 2008
1242008
Design of robust layout for dynamic plant layout problems
VM Pillai, IB Hunagund, KK Krishnan
Computers & Industrial Engineering 61 (3), 813-823, 2011
1202011
A real-time scheme of cubic parametric curve interpolations for CNC systems
B Bahr, X Xiao, K Krishnan
Computers in Industry 45 (3), 309-317, 2001
772001
Study of the impact of riveting sequence, rivet pitch, and gap between sheets on the quality of riveted lap joints using finite element method
F Aman, SH Cheraghi, KK Krishnan, H Lankarani
The International Journal of Advanced Manufacturing Technology 67, 545-562, 2013
722013
A two-stage metaheuristic algorithm for the dynamic vehicle routing problem in Industry 4.0 approach
M Abdirad, K Krishnan, D Gupta
Journal of Management Analytics 8 (1), 69-83, 2021
682021
A simulation-based approach for risk assessment of facility layout designs under stochastic product demands
I Jithavech, KK Krishnan
The International Journal of Advanced Manufacturing Technology 49, 27-40, 2010
622010
Facility layout design for multiple production scenarios in a dynamic environment
KK Krishnan, SH Cheraghi, CN Nayak
International Journal of Industrial and Systems Engineering 3 (2), 105-133, 2008
582008
Mitigation of Risk in Facility Layout Design for Single and Multi-Period Problems
KK Krishnan, H Jithavech, Id, Liao
442009
A comprehensive approach to facility layout design and cell formation
KK Krishnan, S Mirzaei, V Venkatasamy, VM Pillai
The International Journal of Advanced Manufacturing Technology 59, 737-753, 2012
422012
Dynamic From-Between Chart: a new tool for solving dynamic facility layout problems
KK Krishnan, SH Cheraghi, CN Nayak
International Journal of Industrial and Systems Engineering 1 (1-2), 182-200, 2006
412006
Examining the impact of E-supply chain on service quality and customer satisfaction: a case study
M Abdirad, K Krishnan
International Journal of Quality and Service Sciences 14 (2), 274-290, 2022
402022
Virtual reality case study throughout the curriculum to address competency gaps
L Whitman, D Malzahn, V Madhavan, G Weheba, K Krishnan
International Journal of Engineering Education 20 (5), 690-702, 2004
352004
Cost efficient robust global supply chain system design under uncertainty
AT Almaktoom, KK Krishnan, P Wang, S Alsobhi
The International Journal of Advanced Manufacturing Technology 85, 853-868, 2016
342016
Analysis of damage costs in supply chain systems
SA Alsobhi, KK Krishnan, D Gupta, AT Almaktoom
International Journal of Industrial and Systems Engineering 28 (1), 70-98, 2018
322018
Assurance of system service level robustness in complex supply chain networks
AT Almaktoom, KK Krishnan, P Wang, S Alsobhi
The International Journal of Advanced Manufacturing Technology 74, 445-460, 2014
302014
An analytical method for predicting damage zone in orthogonal machining of unidirectional composites
AS Jahromi, B Bahr, KK Krishnan
Journal of Composite Materials 48 (27), 3355-3365, 2014
262014
Automated job shop scheduling with dynamic processing times and due dates using project management and industry 4.0
P Kianpour, D Gupta, KK Krishnan, B Gopalakrishnan
Journal of Industrial and Production Engineering 38 (7), 485-498, 2021
242021
Optimisation of stochastic assembly line for balancing under high variability
KK Krishnan, AT Almaktoom, P Udayakumar
International Journal of Industrial and Systems Engineering 22 (4), 440-465, 2016
232016
A mixed integer programming formulation for multi-floor layout
K k Krishnan, AA Jaafari, MA andHosein Hojabri
African Journal of Business Management 3 (10), 616, 2009
22*2009
The system can't perform the operation now. Try again later.
Articles 1–20