Folgen
Marcius Carvalho
Marcius Carvalho
Bestätigte E-Mail-Adresse bei puc-campinas.edu.br
Titel
Zitiert von
Zitiert von
Jahr
An efficient hydrothermal scheduling algorithm
MF Carvalho, S Soares
IEEE Transactions on Power Systems 2 (3), 537-542, 1987
1361987
Optimal active power dispatch by network flow approach
MF Carvalho, S Soares, T Ohishi
IEEE Transactions on Power Systems 3 (4), 1640-1647, 1988
981988
Urban geometry and the microclimate of street canyons in tropical climate
LP Muniz-Gäal, CC Pezzuto, MFH de Carvalho, LTM Mota
Building and Environment 169, 106547, 2020
942020
A short term hydrothermal scheduling approach for dominantly hydro systems
T Ohishi, S Soares, MF de Carvalho
IEEE Transactions on Power systems 6 (2), 637-643, 1991
681991
Conhecimento e vida na escola: convivendo com as diferenças
MF Carvalho
Campinas: Autores Associados, 2006
582006
Mangal communities of the" Salgado Paraense": ecological heterogeneity along the Bragança peninsula assessed through soil and leaf analyses
E Medina, T Giarrizzo, M Menezes, CM Lira, M Carvalho, EA Peres, ...
Volume 16, fascículo 3/4, 2001, página 397-416, 2001
542001
Efficiency and effectiveness analysis of public transport of Brazilian cities
M Carvalho, T Syguiy
Journal of Transport Literature 9, 40-44, 2015
482015
Classificação de fragmentos florestais urbanos com base em métricas da paisagem
AL Silva, RM Longo, A Bressane, MFH Carvalho
Ciência Florestal 29, 1254-1269, 2019
302019
Eficiência térmica de materiais de cobertura
LP Muniz-Gäal, CC Pezzuto, MFH Carvalho, LTM Mota
Ambiente Construído 18, 503-518, 2018
282018
Gestão do conhecimento aplicada à gestão por processos: Identificação de funcionalidades requeridas às soluções de Business Process Management System (BPMS)
JC Contador, JO De Sordi, B de Lourdes Marinho, MFH de Carvalho
RAI-Revista de Administração e Inovação 2 (2), 5-18, 2005
222005
Efficient logistic platform design: the case of Campinas Platform
CC de Carvalho, MFH De Carvalho, OF Lima Jr
XVI International Conference on Industrial Engineering and Operations …, 2010
202010
Multiproduct multistage production scheduling (MMPS) for manufacturing systems
MF Carvalho, CAO Fernandes, PAV Ferreira
Production Planning & Control 10 (7), 671-681, 1999
171999
O planejamento da manufatura: práticas industriais e métodos de otimização
MF Carvalho, OS Silva Filho, CAO Fernandes
Gestão & Produção 5, 34-59, 1998
171998
Development of a surface temperature sensor to enhance energy efficiency actions in buildings
L Mota, A Mota, C Pezzuto, M Carvalho, M Lavorato, L Coiado, E Oliveira
Sensors 18 (9), 3046, 2018
162018
Avaliação da cooperação entre empresas pela troca de informação
MFH Carvalho, RS Silva
Gestão & Produção 16, 479-488, 2009
16*2009
Análise de políticas de gestão em cadeias de suprimentos por modelos de simulação
CM Oliveira, MFH Carvalho
Gestão & produção 11, 313-329, 2004
152004
Efficiency versus satisfaction in public transport: Practices in Brazilian cities
T Suguiy, MFH de Carvalho, PAV Ferreira
Case Studies on Transport Policy 8 (3), 938-945, 2020
142020
Optimal power flow models using network flow method
CH Fujisawa, MF Carvalho, AT Azevedo, S Soares, EP Santos, T Ohishi
2012 Sixth IEEE/PES Transmission and Distribution: Latin America Conference …, 2012
122012
Production scheduling on practical problems
MFG De Carvalho, RBB Haddad
Production Scheduling, InTech, Rijeka, Croatia, 157-182, 2012
122012
Parâmetros urbanísticos e o conforto térmico de cânions urbanos: o exemplo de Campinas, SP
LP Muniz-Gäal, CC Pezzuto, MFH Carvalho, LTM Mota
Ambiente Construído 18, 177-196, 2018
112018
Das System kann den Vorgang jetzt nicht ausführen. Versuchen Sie es später erneut.
Artikel 1–20