Follow
Wojciech Bożejko
Wojciech Bożejko
Professor, Wroclaw University of Science and Technology
Verified email at pwr.edu.pl - Homepage
Title
Cited by
Cited by
Year
Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling
M Rogalska, W Bożejko, Z Hejducki
Automation in Construction 18 (1), 24-31, 2008
1772008
Parallel hybrid metaheuristics for the flexible job shop problem
W Bożejko, M Uchroński, M Wodecki
Computers & Industrial Engineering 59 (2), 323-333, 2010
1062010
Parallel tabu search algorithm for the hybrid flow shop problem
W Bożejko, J Pempera, C Smutnicki
Computers & Industrial Engineering 65 (3), 466-474, 2013
762013
Block approach—tabu search algorithm for single machine total weighted tardiness problem
W Bożejko, J Grabowski, M Wodecki
Computers & Industrial Engineering 50 (1-2), 1-14, 2006
732006
Parallel tabu search for the cyclic job shop scheduling problem
W Bożejko, A Gnatowski, J Pempera, M Wodecki
Computers & Industrial Engineering 113, 512-524, 2017
652017
Applying metaheuristic strategies in construction projects management
W Bożejko, Z Hejducki, M Wodecki
Journal of Civil Engineering and Management 18 (5), 621-630, 2012
582012
Solving the flow shop problem by parallel simulated annealing
M Wodecki, W Bożzejko
Parallel Processing and Applied Mathematics: 4th International Conference …, 2002
582002
Solving resource-constrained construction scheduling problems with overlaps by metaheuristic
W Bożejko, Z Hejducki, M Uchroński, M Wodecki
Journal of Civil Engineering and Management 20 (5), 649-659, 2014
542014
A fast hybrid tabu search algorithm for the no-wait job shop problem
W Bożejko, M Makuchowski
Computers & Industrial Engineering 56 (4), 1502-1509, 2009
472009
The new golf neighborhood for the exible job shop problem
W Bożejko, M Uchroński, M Wodecki
Procedia Computer Science 1 (1), 289-296, 2010
432010
Parallel path relinking method for the single machine total weighted tardiness problem with sequence-dependent setups
W Bożejko
Journal of Intelligent Manufacturing 21, 777-785, 2010
392010
Parallel simulated annealing for the job shop scheduling problem
W Bożejko, J Pempera, C Smutnicki
Computational Science–ICCS 2009: 9th International Conference Baton Rouge …, 2009
352009
Block approach to the cyclic flow shop scheduling
W Bożejko, M Uchroński, M Wodecki
Computers & Industrial Engineering 81, 158-166, 2015
302015
A new class of parallel scheduling algorithms
W Bożejko
Oficyna wydawn. Politechniki Wrosłwskiej, 2010
282010
Solving the flow shop problem by parallel programming
W Bożejko
Journal of parallel and distributed computing 69 (5), 470-481, 2009
272009
On the theoretical properties of swap multimoves
W Bożejko, M Wodecki
Operations Research Letters 35 (2), 227-231, 2007
272007
Solving the no-wait job-shop problem by using genetic algorithm with automatic adjustment
W Bożejko, M Makuchowski
The International Journal of Advanced Manufacturing Technology 57, 735-752, 2011
262011
Parallel genetic algorithm for the flow shop scheduling problem
W Bożejko, M Wodecki
Parallel Processing and Applied Mathematics: 5th International Conference …, 2004
262004
Flowshop scheduling of construction processes with uncertain parameters
W Bozejko, Z Hejducki, M Wodecki
Archives of Civil and Mechanical Engineering 19, 194-204, 2019
252019
On single-walk parallelization of the job shop problem solving algorithms
W Bożejko
Computers & Operations Research 39 (9), 2258-2264, 2012
242012
The system can't perform the operation now. Try again later.
Articles 1–20