Folgen
Ergo Pikas
Ergo Pikas
Assistant Professor, Tallinn University of Technology
Bestätigte E-Mail-Adresse bei taltech.ee - Startseite
Titel
Zitiert von
Zitiert von
Jahr
Construction with digital twin information systems
R Sacks, I Brilakis, E Pikas, HS Xie, M Girolami
Data-Centric Engineering 1, e14, 2020
3672020
Building information modeling education for construction engineering and management. I: Industry requirements, state of the art, and gap analysis
R Sacks, E Pikas
Journal of Construction Engineering and Management 139 (11), 04013016, 2013
3172013
Cost optimal and nearly zero energy building solutions for office buildings
E Pikas, M Thalfeldt, J Kurnitski
Energy and Buildings 74, 30-42, 2014
2192014
Facade design principles for nearly zero energy buildings in a cold climate
M Thalfeldt, E Pikas, J Kurnitski, H Voll
Energy and Buildings 67, 309-321, 2013
1882013
Building information modeling education for construction engineering and management. II: Procedures and implementation case study
E Pikas, R Sacks, O Hazzan
Journal of Construction Engineering and Management 139 (11), 05013002, 2013
1752013
KanBIM Workflow Management System: Prototype implementation and field testing.
R Sacks, R Barak, B Belaciano, U Gurevich, E Pikas
Lean Construction Journal, 2013
1132013
Quantification of economic benefits of renovation of apartment buildings as a basis for cost optimal 2030 energy efficiency strategies
E Pikas, J Kurnitski, R Liias, M Thalfeldt
Energy and Buildings 86, 151-160, 2015
822015
Epistemological explanation of lean construction
L Koskela, A Ferrantelli, J Niiranen, E Pikas, B Dave
Journal of Construction Engineering and Management 145 (2), 04018131, 2019
742019
If CPM is so bad, why have we been using it so long?
L Koskela, G Howell, E Pikas, B Dave
702014
ViBR–conceptualising a virtual big room through the framework of people, processes and technology
B Dave, E Pikas, H Kerosuo, T Mäki
Procedia Economics and Finance 21, 586-593, 2015
582015
Energy and investment intensity of integrated renovation and 2030 cost optimal savings
J Kurnitski, K Kuusk, T Tark, A Uutar, T Kalamees, E Pikas
Energy and Buildings 75, 51-59, 2014
562014
Intelligent products: shifting the production control logic in construction (with Lean and BIM)
B Dave, S Kubler, E Pikas, J Holmström, V Singh, K Främling, L Koskela
Proceedings of the 23rd Annual Conference of the International Group for …, 2015
442015
Cost-benefit analysis of nZEB energy efficiency strategies with on-site photovoltaic generation
E Pikas, J Kurnitski, M Thalfeldt, L Koskela
Energy 128, 291-301, 2017
422017
Towards shared understanding on common ground, boundary objects and other related concepts
L Koskela, E Pikas, D Gomes, C Biotto, S Talebi, N Rahim, ...
Proc. 24th Ann. Conf. of the Int’l. Group for Lean Construction, Boston, MA …, 2016
382016
Review of lean design management: processes, methods and technologies
P Uusitalo, H Olivieri, O Seppänen, E Pikas, A Peltokorpi
Proceedings of the 25th annual conference of the international group for …, 2017
362017
Improving Building Design Processes and Design Management Practices: A Case Study
E Pikas, L Koskela, O Seppänen
Sustainability 12 (3 (Special Issue: Lean Design and BIM)), 911, 2020
352020
Extra cost analyses of two apartment buildings for achieving nearly zero and low energy buildings
E Pikas, M Thalfeldt, J Kurnitski, R Liias
Energy 84, 623-633, 2015
322015
Field tests of the Kanbim™ lean production management system
R Sacks, R Barak, B Belaciano, U Gurevich, E Pikas
Annual Conference of the International Group for Lean Construction, 465-476, 2011
242011
Overview of building information modelling in healthcare projects
E Pikas, L Koskela, S Sapountzis, B Dave, RB Owen
Global health infrastructure-challenges for the next decade: Delivering …, 2011
222011
Case study on design management: Inefficiencies and possible remedies
E Pikas, L Koskela, B Dave, R Liias
IGLC. net, 2015
182015
Das System kann den Vorgang jetzt nicht ausführen. Versuchen Sie es später erneut.
Artikel 1–20