Folgen
Hassan Hashemi
Hassan Hashemi
School of Civil Engineering; Iran University of Science and Technology; Tehran; Iran
Bestätigte E-Mail-Adresse bei civileng.iust.ac.ir
Titel
Zitiert von
Zitiert von
Jahr
A novel two-phase group decision making approach for construction project selection in a fuzzy environment
S Ebrahimnejad, SM Mousavi, R Tavakkoli-Moghaddam, H Hashemi, ...
Applied Mathematical Modelling 36 (9), 4197-4217, 2012
2032012
A new design of the elimination and choice translating reality method for multi-criteria group decision-making in an intuitionistic fuzzy environment
B Vahdani, SM Mousavi, R Tavakkoli-Moghaddam, H Hashemi
Applied Mathematical Modelling 37 (4), 1781-1799, 2013
1682013
A fuzzy integrated methodology for evaluating conceptual bridge design
H Malekly, SM Mousavi, H Hashemi
Expert Systems with Applications 37 (7), 4910-4920, 2010
1402010
Location of cross-docking centers and vehicle routing scheduling under uncertainty: a fuzzy possibilistic–stochastic programming model
SM Mousavi, B Vahdani, R Tavakkoli-Moghaddam, H Hashemi
Applied Mathematical Modelling 38 (7-8), 2249-2264, 2014
1152014
A new compromise solution method for fuzzy group decision-making problems with an application to the contractor selection
B Vahdani, SM Mousavi, H Hashemi, M Mousakhani, ...
Engineering Applications of Artificial Intelligence 26 (2), 779-788, 2013
1082013
A new group decision model based on grey-intuitionistic fuzzy-ELECTRE and VIKOR for contractor assessment problem
H Hashemi, SM Mousavi, EK Zavadskas, A Chalekaee, Z Turskis
Sustainability 10 (5), 1635, 2018
842018
Risk assessment for highway projects using jackknife technique
SM Mousavi, R Tavakkoli-Moghaddam, A Azaron, SMH Mojtahedi, ...
Expert Systems with Applications 38 (5), 5514-5524, 2011
752011
A new support vector model-based imperialist competitive algorithm for time estimation in new product development projects
SM Mousavi, R Tavakkoli-Moghaddam, B Vahdani, H Hashemi, ...
Robotics and Computer-Integrated Manufacturing 29 (1), 157-168, 2013
732013
An extended compromise ratio model with an application to reservoir flood control operation under an interval-valued intuitionistic fuzzy environment
H Hashemi, J Bazargan, SM Mousavi, B Vahdani
Applied Mathematical Modelling 38 (14), 3495-3511, 2014
662014
A new decision model for cross-docking center location in logistics networks under interval-valued intuitionistic fuzzy uncertainty
SM Mousavi, J Antuchevičienė, EK Zavadskas, B Vahdani, H Hashemi
Transport 34 (1), 30-40, 2019
552019
Bootstrap technique for risk analysis with interval numbers in bridge construction projects
H Hashemi, SM Mousavi, SMH Mojtahedi
Journal of Construction Engineering and Management 137 (8), 600-608, 2011
532011
A compromise ratio method with an application to water resources management: an intuitionistic fuzzy set
H Hashemi, J Bazargan, SM Mousavi
Water resources management 27, 2029-2051, 2013
482013
A novel approach based on non-parametric resampling with interval analysis for large engineering project risks
SM Mousavi, R Tavakkoli-Moghaddam, H Hashemi, SMH Mojtahedi
Safety science 49 (10), 1340-1348, 2011
422011
A fuzzy comprehensive approach for risk identification and prioritization simultaneously in EPC projects
R Tavakkoli-Moghaddam, SM Mousavi, H Hashemi
Risk management in environment, production and economy 12, 123-46, 2011
402011
Compromise ranking approach with bootstrap confidence intervals for risk assessment in port management projects
H Hashemi, SM Mousavi, R Tavakkoli-Moghaddam, Y Gholipour
Journal of Management in Engineering 29 (4), 334-344, 2013
372013
A NEW INTERVAL-VALUED INTUITIONISTIC FUZZY MODEL TO GROUP DECISION MAKING FOR THE SELECTION OF OUTSOURCING PROVIDERS.
S Ebrahimnejad, H Hashemi, SM Mousavi, B Vahdani
Economic Computation & Economic Cybernetics Studies & Research 49 (2), 2015
322015
Evaluating highway construction projects’ sustainability using a multicriteria group decision-making model based on bootstrap simulation
P Ghoddousi, F Nasirzadeh, H Hashemi
Journal of construction engineering and management 144 (9), 04018092, 2018
262018
A new hybrid model based on least squares support vector machine for project selection problem in construction industry
B Vahdani, SM Mousavi, H Hashemi, M Mousakhani, S Ebrahimnejad
Arabian Journal for Science and Engineering 39, 4301-4314, 2014
262014
A new enhanced support vector model based on general variable neighborhood search algorithm for supplier performance evaluation: A case study
B Vahdani, SM Mousavi, R Tavakkoli-Moghaddam, H Hashemi
International Journal of Computational Intelligence Systems 10 (1), 293-311, 2017
242017
A neural network model based on support vector machine for conceptual cost estimation in construction projects
B Vahdani, SM Mousavi, M Mousakhani, M Sharifi, H Hashemi
JOURNAL OF OPTIMIZATION IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL …, 2012
232012
Das System kann den Vorgang jetzt nicht ausführen. Versuchen Sie es später erneut.
Artikel 1–20